Subway construction slurry separation system

Feb 01, 2019

KOSUN Subway construction slurry separation system is suitable for purifying slurry in tunneling, micro-tunneling, pipe-jacking, bored piles construction, piling construction and diaphragm wall construction, etc. KOSUN has demonstrated its high-performance capabilities at many job sites worldwide.
 
KOSUN slurry separation system Features:
(1) Simple and useful treatment process, as well as convenient installation, operation and maintenance;
(2) Modular and integrated design, transportation and installation subject to standard container size, foldable operating platform, compact structure, small footprint and flexible field use;
(3) Adjustable G-force of shale shaker, screen panel angle and mesh size, strong overall system adaptability and easier treatment of materials from various formations;
(4) Meet separation requirements on various materials and customize process as per the cut point of D 50 ; meet the requirements on different handling capacities, 100~3000m³/h;
(5) Meet various power specifications as per construction needs, and even generator set can be used for operation;
(6) The whole system is skid-mounted integrated system and can be also changed into vehicle-mounted mobile treatment units.
 
For more information on KOSUN Subway construction slurry separation system, please feel free to contact with KOSUN.
 

Xi’an KOSUN Environmental Engineering Co., Ltd.

Tel.: +86 29 87304914

Email: sales2@adkosun.com

Contact person: Lily Wang

Online consulting:

http://www.kosun.com

http://www.kosuneco.com